RATED #1 DECK BUILDING COMPANY IN KNOXVILLE AREA BY OVER 1,000 PEOPLE
Composite Deck on a Steep Wooded Lot in Maryville, TN
164 sq ft of composite deck and boardwalk · helical piers driven 24 ft and 14 ft · composite stairs down the slope with landings · black aluminum railing throughout.
- Location: Maryville, TN
- Price: $35,058










Part One : An Old Deck at the Foot of a Maryville Hillside
The first soil test on this lot, on July 17, found soft ground all the way down to 36 in. Every footing on the new deck was chosen with that result in hand.
The old deck sat at the bottom of a wooded slope behind the house. A wood boardwalk ran down to it from the concrete patio, and a long wood stairway climbed the hill back to the house.
We photographed the layout on May 21, and on the July 1 visit the timber steps at the deck were breaking apart and one post base was badly worn.
The homeowner wanted the new upper deck to meet the existing patio. At that same meeting we raised two questions: how much dirt work it would take, and whether the hillside soil would hold new posts.
- Timber steps breaking apart
- A badly worn post base
- Soft ground to 36 in deep
- Low posts on sloping ground
- Gray boards and railing
What We Found



- Crumbling steps. The timber steps at the old deck were coming apart, and the post base beside them was badly worn.
- Posts on soft ground. The old deck stood on low posts set into the slope, and the July 17 test found the ground extremely soft to 36 in.
- Gray, weathered wood. Boards and railing had gone gray from one end of the deck to the other.
Part Two : Soil Testing, Helical Piers and a Price That Held

Testing Before Digging

Holding the Price

Footings and Framing

Decking and Boardwalk

Stairs and Railing

Permits and Engineer's Letters
Part Three : Piers in September, Finished by Mid-October
| Date | What Happened |
|---|---|
| Sept 14 | Slope cleared and marked for the stairway. Helical piers driven, one to 24 ft and one to 14 ft, each until it reached the engineer's required load. |
| Sept 21 to 28 | A machine delay and backordered fascia pushed the start back a couple of days. By Sept 28 two screw piles sat under the stair landing, and the stairs and landings were up with railing. |
| Oct 5 to 7 | Footing inspection record filed Oct 5. The crew was back Oct 7, with the top flight to the house still in open framing. |
| Oct 14 to 19 | Job finished Oct 14 per the crew log. Completion checklist signed Oct 15, and the decking and railing warranties registered Oct 19. |

Hillside Stairs and Deck, Then and Now
The gray deck at the bottom of the hill is now 164 sq ft of composite on helical piers, with composite stairs and black railing climbing the slope in short flights. For a flat-lot tear-out, see the deck replacement in three days in Knoxville.




- Tear-out of the old deck, boardwalk and stairs
- Soil compaction test and a soil engineer's footing plan
- Helical piers plus 11 poured concrete footings, 20 by 20 by 12 in
- 2x10 treated ledger and joists spaced 12 in apart
- 164 sq ft of composite across deck and boardwalk, edged with border boards and an inlay
- Fascia, stair treads, risers and skirting, all composite
- Composite stairs down the slope with 4 by 4 ft landings, finishing on poured concrete
- Black aluminum railing: about 64 ft across deck and boardwalk, 22 ft on the stairs
- City of Maryville permit, engineer's letter and stamped helical pier letter
- Decking and railing warranties registered with the manufacturers

Helical Piers

Deck and Boardwalk Boards
Westbury Black Aluminum Railing

Composite Stairs and Landings
Materials and Finishes
Composite Deck Builder, Maryville, TN: Building Under Trees
A deck under a tree canopy stays damp longer than one in open sun, because leaves land on it and the shade holds the moisture, and an East Tennessee summer adds humidity on top. That is how the old wood deck and stairs on this lot went gray and the timber steps came apart.
Composite boards take on far less water than pressure-treated wood, so the decking, the stair treads and the skirting here are all composite, and the pressure-treated 2×10 frame sits above grade on footings and piers where it stays drier.
The other half of deck building in Blount County is the site conditions: a slope, soft ground, and a stairway that has to be broken into flights with landings, and on this job that meant a soil engineer, helical piers and a multi-level layout that climbs the hill in short runs.
We serve Maryville from Knoxville, every footing gets sized to what the ground will hold, and the decking and railing warranties were registered with the manufacturers at closeout.
Why did this Maryville deck need helical piers?
The July 17 soil test found soft ground to 36 in, so a soil engineer placed helical piers at the top of the stairway and a poured footing in the middle, and each pier was driven until the ground pushed back hard enough to carry the load.
How long did the hillside deck take to build?
The piers went in September 14 and the crew log closed the job October 14, with a machine delay and backordered fascia inside that month.
What does a composite deck on a slope cost?
This one was $35,058, the same total as the May contract, because a slightly smaller lower deck paid for the soil engineer and the piers.
This Hillside Deck and Stairway Was $35,058
The total is the same as the contract signed in May. A smaller lower deck paid for the soil engineer and the piers, and the rest of the plan stayed as drawn. Financing is available.
960+
decks built & repaired
600+
clients served
115+
5-star reviews
60+

Meet the Owner
What Your Neighbors Say

Heather M. Burke
We love our deck. More than we thought we would. Nate was great at helping get the design right and Emmanuel made sure it was build right and we were happy

Joe Bucci
I found Riverview Decks to be extremely easy to work with. They recently completed a deck and stair project for us. We gave them a mostly baked idea of what we wanted and they came up with a final design we just love that worked for our budget. Easily my favorite contractor I’ve worked with. Couldn’t recommend them enough.

Greg Berney
Nate and the entire team at Riverview Decks do an incredible job. Highly professional, fair pricing, and great service. They show up when they say the will, provide high quality in their work, and are always responsive. I highly recommend them for your deck work.
Find Out What Your Hillside Will Hold Before You Plan a Deck on It
If your yard drops away from the house, the soil under it decides what the footings will be, and the footings decide the price, so we test the ground before we quote. You can also look at more finished deck projects in Knoxville or read our guide to clay soil and deck foundations. Call (865) 801-4545 or fill out the form.